200t 300 Tons Lowbed Goldhofer Hydraulic Axis Heavy-Duty Equipment Transportation Multi-Axle Hydraulic Modular Trailer

Product Details
Customization: Available
Type: Semi-Trailer
Load Capacity: 300ton
Still deciding? Get samples of US$ 80000/unit
Order Sample
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment methods: visa mastercard discover JCB diners club american express T/T
  Support payment in USD
Secure payments: Every payment you make at Made-in-china.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Secured Trading Service
Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Customization from Samples
The supplier provides sample based customization services
Customization from Designs
The supplier provides design based customization services
to see all verified strength labels (14)
  • 200t 300 Tons Lowbed Goldhofer Hydraulic Axis Heavy-Duty Equipment Transportation Multi-Axle Hydraulic Modular Trailer
  • 200t 300 Tons Lowbed Goldhofer Hydraulic Axis Heavy-Duty Equipment Transportation Multi-Axle Hydraulic Modular Trailer
  • 200t 300 Tons Lowbed Goldhofer Hydraulic Axis Heavy-Duty Equipment Transportation Multi-Axle Hydraulic Modular Trailer
  • 200t 300 Tons Lowbed Goldhofer Hydraulic Axis Heavy-Duty Equipment Transportation Multi-Axle Hydraulic Modular Trailer
  • 200t 300 Tons Lowbed Goldhofer Hydraulic Axis Heavy-Duty Equipment Transportation Multi-Axle Hydraulic Modular Trailer
  • 200t 300 Tons Lowbed Goldhofer Hydraulic Axis Heavy-Duty Equipment Transportation Multi-Axle Hydraulic Modular Trailer
Find Similar Products
  • Overview
  • Product Description
  • Product Parameters
  • Packaging & Shipping
  • Company Profile
  • Customers and Exhibition
Overview

Basic Info.

Model NO.
SDLL9404
Grade
Heavy Duty
Types of Suspension Systems
Air Suspension
Axle Number
24 Axle
Tire Number
48
Self-dumping
Not Self-dumping
ABS Anti-lock Braking System
No ABS Anti-lock Braking System
Material
Steel
Condition
New
Use
Truck Trailer
Landing Gear
Jost/Fuwa/Yahua Brand 28t
Color
Optional
Suspension
Air Suspension
Tire
215/75r17.5
Axle
Ctc
Chassis
Q345 or T300 High Strength Bao Steel Material
Transport Package
Shipped by Truck or Bulk Carrier
Specification
21000*2500*2980
Trademark
Laoli
Origin
Shandong, China
Production Capacity
5000units/Year

Packaging & Delivery

Package Size
2160.00cm * 300.00cm * 170.00cm
Package Gross Weight
50000.000kg

Product Description

Product Description

 

200t 300 Tons Lowbed Goldhofer Hydraulic Axis Heavy-Duty Equipment Transportation Multi-Axle Hydraulic Modular Trailer

200t 300 Tons Lowbed Goldhofer Hydraulic Axis Heavy-Duty Equipment Transportation Multi-Axle Hydraulic Modular Trailer
 
150-250Ton modular trailer
For transporting of heavy goods, low center of gravity, good carrying capacity, safety factor high, with removable gooseneck,which
will help the loading of goods.
200t 300 Tons Lowbed Goldhofer Hydraulic Axis Heavy-Duty Equipment Transportation Multi-Axle Hydraulic Modular Trailer
 
The frame part is welded with high-quality HG60 and Q345 steel. The central longitudinal beam and the splicing point have superior
connection strength. The frame parts are calculated by computer CAD-aided design and ANSYS strength design, and are strictly
produced according to ISO9000 quality system. Has excellent quality.
 
200t 300 Tons Lowbed Goldhofer Hydraulic Axis Heavy-Duty Equipment Transportation Multi-Axle Hydraulic Modular Trailer
200t 300 Tons Lowbed Goldhofer Hydraulic Axis Heavy-Duty Equipment Transportation Multi-Axle Hydraulic Modular Trailer
200t 300 Tons Lowbed Goldhofer Hydraulic Axis Heavy-Duty Equipment Transportation Multi-Axle Hydraulic Modular Trailer
200t 300 Tons Lowbed Goldhofer Hydraulic Axis Heavy-Duty Equipment Transportation Multi-Axle Hydraulic Modular Trailer
200t 300 Tons Lowbed Goldhofer Hydraulic Axis Heavy-Duty Equipment Transportation Multi-Axle Hydraulic Modular Trailer
200t 300 Tons Lowbed Goldhofer Hydraulic Axis Heavy-Duty Equipment Transportation Multi-Axle Hydraulic Modular Trailer

 
 
Product Parameters
Brand Laoli
Type Hydraulically removable gooseneck+5 line+3 line modular trailer
Payload Capability

 
18000kgs /Row 20Km/h
 
Tare Weight
 
Gooseneck weight :65000kg +3800 kgs/Row
 
Material
 
Main beam material is S690high tensile Steel,others material is Q355B high tensile Steel 
 
Loading Deck Height and Lifting Area
 
850-1360mm(Free lift,lowest 850mm,highest 1360mm)

 
Width of Platform
 
3000mm
Length of platform
 
1550mm*12=18600mm
Length of Gooseneck
 
According to the tractor design
 
Max Steering Angle +/-40°
Brake
 
Dual line pneumatic brake system,T30 air chamber; parking brake;
 
Electrical System
 
24V, 7core socket, lights according to European standards.
 
Wheelbase
 
1550mm
wheel track 735/1820mm
Tire
 
215/75R17.5,64 pcs ,Double Coin Brand
 
Rim
 
6.00-17.5  64 pcs ,
Axle +Suspension assembly
 
Standard emblem mark,8 line 16 axles with hydraulic steering system
Suspension
 
Hydraulic suspension ,hydraulic lifting and descending ,hydraculic steering
 
Tire & Rims No /line
 
8 sets
 
Connection Platform
 
Optional by Cargo / Machine Size
 
Pin Height
 
According to the height of the tractor saddle.
 
Painting
 
Three coats painting; Any color will be available
 
Lights
 
Rear light, rear reflector, turn indicative light, side
reflector, fog lamp, number plate light
Tool Box
 
One tool box with a set of standard trailer tools
 
Tyre Carrier
 
One piece
Others
 
Wax -spray before delivery

 
 
Packaging & Shipping

 

200t 300 Tons Lowbed Goldhofer Hydraulic Axis Heavy-Duty Equipment Transportation Multi-Axle Hydraulic Modular Trailer
 
In nude,Polish with water wax before shipment
1. By 40ft/45ft/40fr container
2. By bulk /roro ship
3. As your requirments.
Professional package saves freight cost for you. In order to prevent seawater corrosion,we will carefully Wrap film or covered tarpaulin.When goods arrive in Africa, Australia and even South America, they can maintain a good appearance.
High quality painting and professional transportation ensure good condition of goods.
We believe that we can win-win by providing detailed services.
 
Company Profile
200t 300 Tons Lowbed Goldhofer Hydraulic Axis Heavy-Duty Equipment Transportation Multi-Axle Hydraulic Modular Trailer
Shandong Laoli Special Vehicle Co., Ltd. Is located in Liangshan, Water margin 108 will gather the place of righteousness. Liangshan has beautiful scenery, deep history. Our company mainly engaged in the production and sales of semi-trailers, the main products are: Side wall semi trailer, Fence semi trailer, box/van type semi trailer, container transport semi trailers, low bed trailer, tipper trailer, fuel tanker semi trailer, bulk cement semi trailers, LPG tanker trailer, Special vehicles.
We adhere to the "quality first, customer first" business philosophy, with excellent product quality, good service attitude, reasonable sales price to win the trust and support of customers at home and abroad. The main export countries and regions are: Southeast Asia, Central Asia, Central and South America, Africa. We have a professional design and development team, can design and develop more suitable for you according to your needs; Nearly 10 years of export experience, familiar with the export process of various countries and required certification, can deliver your car more quickly to your hands; We have first-class production equipment, strong technical force and advanced testing means to provide you with more stable and reliable vehicles

Up to now, we have exported more than 1000 vehicles to more than 50 countries and regions around the world, winning wide praise from consumers
Welcome customers to purchase and negotiate.

200t 300 Tons Lowbed Goldhofer Hydraulic Axis Heavy-Duty Equipment Transportation Multi-Axle Hydraulic Modular Trailer

 
 
 
 
 
Customers and Exhibition

 

Q1. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages
before you pay the balance.
Q2. How about your delivery time?
A: Generally, it will take 15 to 30 days after receiving your advance payment. The specific delivery time depends
on the items and the quantity of your order.
Q3.How to control quality?
We set up all process inspection and quality control standard, include raw materials, production process, finished products.
Advanced equipment and standard inspection process ensure the quality.
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier